Pillur Dam Water Level Surpasses 90 Feet

The Pillur Dam, a crucial drinking water source for Coimbatore and Tiruppur districts, has seen its water level rise above 90 feet due to rainfall in catchment areas.


Coimbatore: The water level in Pillur Dam, a vital drinking water source for the residents of Coimbatore and Tiruppur districts, has surpassed 90 feet due to continuous rainfall in its catchment areas. The dam, which has a total capacity of 100 feet, currently stands at 93.50 feet.

According to officials, the dam is currently receiving an inflow of 1,446 cubic feet per second. To maintain safe water levels, authorities are releasing 3,000 cubic feet per second of water into the Bhavani River.

The rising water levels in Pillur Dam bring relief to the residents of Coimbatore and Tiruppur districts, ensuring a stable drinking water supply in the coming months. However, the water release into the Bhavani River has prompted local authorities to issue cautionary notices to people residing in low-lying areas along the river banks.

The Pillur Dam, located on the Bhavani River, is a critical component of the region's water management system. Its current healthy water level is attributed to the northeast monsoon rains that have been active in the catchment areas of the Western Ghats.

Vellalore Residents Stage Road Block Protest Against Proposed Waste Segregation Centre

Alleging that the existing dump yard has been causing severe health problems and contaminating groundwater sources for y...

Passenger Alert: Two Express Trains via Coimbatore to Face Delays

Passengers travelling on the Ernakulam–Tatanagar Express and Alappuzha–Dhanbad Express via Coimbatore are likely to expe...

Koniamman Temple Hundi Theft : Eight Suspended, Police Register Case; Probe underway

The Hindu Religious and Charitable Endowments (HR&CE) Department has initiated disciplinary action against eight persons...

Ward Councillor Inspects Dengue Control and Cleanliness Drive in Peelameedu

Dengue mosquito eradication, park cleaning, and tree waste removal activities were conducted in the Peelameedu area of S...

Minister V Sampathkumar Inaugurates Rs 10.69 Crore Development Projects Including New Sports Arenas and School Facilities in Coimbatore

Backward Classes Welfare Minister V Sampathkumar inaugurated various development projects worth Rs 10.69 crore across fi...

Amaravathi Dam Water Level Rises to 49.18 Feet; Thirumoorthy Dam Records 35.56 Feet

Amaravathi Dam in Tiruppur district reached 49.18 feet and Thirumoorthy Dam recorded 35.56 feet as of July 25. Water Res...