A Hindu outfit staged a protest in front of the Siddhi Vinayakar temple near Gandhipuram signal



Coimbatore: A Hindu outfit staged a protest in front of the Siddhi Vinayakar temple, near Gandhipuram signal, following reports that the temple would be demolished by the highways department to build a flyover in congested Gandhipuram.

 

The state highways department has drawn up plans to construct a flyover at Gandhipuram, besides Eachanari, Ukkadam and near Textool, to ease traffic in these crowded shopping localities. The state government has sanctioned Rs 148 crore for the two tier flyover in Gandhipuram and this requires land acquisition in and around Gandhipuram, said senior highways officials. The roadside Siddhi Vinayakar temple, which draws a large number of devotees at the Gandhipuram junction, is set to be demolished. On Fridayevening, the temple priest and trustees were asked by the highways officials to vacate the premises to make way for the demolition.

On Saturday morning, around 50 members of the Hindu Makkal Katchi, led by its party president Arjun Sampath, staged a protest. The party members condemned the highways officials and the district administration for planning to demolish the 50 year old temple. Mr Sampath urged the highways officials to construct the bridge through alternative routes without demolishing the temple. If the highways proceeded to demolish the temple, Hindu activists would stage a mass agitation, he warned.

Last year, too, the state highways department had stopped plans to construct the flyover, following protests by Hindu organisations. State highways officials had promised a revised design for the two-tier flyover that will not disturb the Vinayakar temple. 

However, in a sudden move, highways officials have now asked the temple authorities to vacate the area. However, an official of the state highways department said collector Archana Patnaik has convened a meeting of officials of the highways and the HR&CE departments on providing alternative places for housing temples if they are demolished. However, the temple will not be removed now. “It will be done later in the course of the three-year project,” the official said. 

The state government has sanctioned Rs 20 crore for the two-lane bridge near Textool, but the flyover does not involve any demolition of existing structures or land acquisition, highways officials said.

Tribal Man Killed in Suspected Wild Elephant Attack Near Karamadai

A 60-year-old tribal man was found dead near Kodungarai Pallam along the Tamil Nadu-Kerala border near Karamadai, with f...

Man Arrested for Knifepoint Robbery and Vandalising Bikes in Vadavalli

Vadavalli police arrested a 31-year-old man for allegedly threatening a youth at knifepoint, robbing him of ₹500 and dam...

Kovilmedu TASMAC Bar Employee Assaulted; Two Arrested

Two men, Madan and Sathish Kumar, were arrested for allegedly assaulting an employee at the bar attached to TASMAC Shop...

Couple Injured in Goods Vehicle-Scooter Collision on Avinashi Road

A 55-year-old man and his wife were injured after a four-wheeler goods vehicle allegedly hit their scooter near the Peel...

Two Arrested for Allegedly Trying to Rob Man near Ondipudur

Two young men were arrested after they allegedly tried to forcibly take money from a 50-year-old man near the Ondipudur...

Falling Siruvani Levels Add to Coimbatore’s Drinking Water Woes

The declining water level at the Siruvani reservoir, which stood at 29.26 feet against its permitted depth of 44.61 feet...